The price of a 150 TPH stone crusher plant can vary significantly depending on factors such as the type of crusher, mobility, brand, and additional features. The costs of a 150 TPH stone crusher plant generally include equipment purchase, installation, labor, operation, and other aspects. The following is a detailed breakdown:
- Crushers: This is the core equipment, and different types of crushers have different prices. For example, a 150 TPH jaw crusher may cost between $24,000 and $50,000. A 150 TPH impact crusher is priced at $30,000 - $60,000, and a 150 TPH hydraulic cone crusher may be in the range of $38,000 - $80,000.
- Vibrating Feeders: Used to evenly feed materials into the crusher, with a price generally ranging from a few thousand dollars to over ten - thousand dollars.
- Vibrating Screens: For example, a 2YK1848 vibrating screen suitable for sandstone screening, its price is affected by factors such as brand and quality, usually ranging from several thousand dollars to tens of thousands of dollars.
- Belt Conveyors: The length and specification of belt conveyors determine their price. For a 150 TPH stone crusher plant, the cost of belt conveyors may range from several thousand dollars to over ten - thousand dollars.
- Auxiliary Equipment: Such as electric control systems, dust - removal equipment, etc. The dust - removal equipment is used to reduce dust pollution during the crushing process, and its price may range from several thousand dollars to tens of thousands of dollars, depending on the type and performance.
- Installation Labor Costs: Professional technicians are required to install the equipment, and the installation labor cost is related to the complexity of the equipment and the local labor wage level, generally accounting for 5% - 10% of the equipment purchase cost.
- Foundation Construction Costs: If it is a stationary stone crusher plant, a foundation needs to be built for the equipment. The cost of foundation construction is related to factors such as soil quality and equipment weight, and may range from tens of thousands of dollars to hundreds of thousands of dollars.
- Commissioning Costs: Including the cost of trial - running the equipment and adjusting parameters, which is relatively small, usually several thousand dollars.
- The cost of land acquisition varies greatly depending on the location and size of the land. If the plant is located in an area with convenient transportation and close to the raw material source, the land price may be relatively high. Generally, the land cost for a 150 TPH stone crusher plant may range from tens of thousands of dollars to hundreds of thousands of dollars.
- Operator Wages: The number of operators required for a 150 TPH stone crusher plant is related to the degree of automation of the equipment, usually 3 - 5 people. The annual wage cost per person is related to the local wage level, and may be in the range of tens of thousands of dollars.
- Maintenance Personnel Wages: Professional maintenance personnel are needed to regularly maintain the equipment to ensure its normal operation. The maintenance personnel wage cost is also related to the local wage level, and the annual cost for each person is also in the range of tens of thousands of dollars.
- Fuel or Electricity Costs: If it is a fuel - powered mobile crusher plant, the fuel cost is a major expense. For a 150 TPH plant, the daily fuel cost may be several hundred to thousands of dollars, depending on the equipment fuel consumption and fuel price. If it is an electric - powered stationary plant, the electricity cost is calculated according to the equipment power and operating time, and the daily electricity cost may also be several hundred dollars.
- Maintenance and Repair Costs: Equipment needs regular maintenance and replacement of wearing parts. The annual maintenance and repair cost is generally about 5% - 10% of the equipment purchase cost.
- Permits and Licenses: The cost of obtaining relevant permits and licenses for setting up a stone crusher plant varies by region, and may range from several thousand dollars to tens of thousands of dollars.
- Environmental Protection Fees: If environmental protection requirements are high, costs such as environmental impact assessments and sewage treatment may be involved, and the cost is also related to local environmental protection policies.
- Raw Material Transportation Costs: The closer the plant is to the raw material source, the lower the transportation cost. If the raw materials need to be transported over a long distance, the transportation cost will increase significantly.
- Finished Product Transportation Costs: The cost of transporting the crushed stone to the sales area is also an important part of the operational cost, which is related to the transportation distance and transportation method.
Please Provide:
- Material hardness (e.g., granite, basalt, limestone)
- Desired output sizes (e.g., 0-5mm, 10-20mm)
- Power source (grid, diesel, hybrid)
We’ll match you with optimized crusher configurations + 2025 supplier discounts!
Save Time! Get A Detailed Quotation Quickly.